Things have been going rather slowly with the build lately. The upper rails are installed, and the caravan received a coat of primer and 2 coats of bright green paint. The interior received a coat of white. We had some leftover floor tiles from remodeling our bathroom that we decided to install. They look great and will be easier to keep clean than a painted floor.

The next step will be to install the bunk and then wall covering. I shopped for cloth but what my wife liked was $45 a yard. Just too pricey. Instead, we have decided to cover thin PVC bathroom wallboard with vinyl wall paper. The plastic should be stiff enough when installed on the caravan to eliminate the need for bows in the middle section of the caravan. Anyway, that is for the next post.